Surface Wallmount Installation
3-10 Installing the Access Point
Surface Wallmount Installation
Follow the step-by-step procedure below to install the Access Point on the surface of a wall,
cubical wall, vertical support structure, or ceiling.
Step Action
1 Make sure the site primary power for the Access Point conforms to the
specifications detailed in Chapter 2 - Cabling and Wiring.
2 Select the optimum mounting location:
• With easy access for inspection and service.
• If using remote power, close to the 10BaseT Ethernet network cable
connector.
• If not
using remote power, within five feet of an AC electrical outlet:
a) If using redundant power (connecting both local power and remote
power).
or
b) If using the local power option and not using the remote power
option.